Ok today I put 440 aresto injectors in my 1jz fuel rail. Once I got everything back together I noticed that the plates that hold the injectors in place was about a 1/16 of a inch to tall. So do I need to grind the towers that the plates bolt into down a 1/16 or did I do something wrong?