and it Begins

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
this is going to be interisting a friend is going to help me build a sub box for the MKIII.

This should be fun will sdd more pics as the project moves forward.



thetube.JPG firstcut.JPG
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
artmo said:
is that going where the spare is supposed to go?


yes thats what AAA is for :) takeing the spare tire out and gonna flatten the bottom of the well a lil bit. not sure if we are gonna raise the back or go through the back floor. still to be determined.
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
mg89 said:

well were at the point of finishing the porting. but the installer is In Eugene Im in Portland and the car DIED on Thursday I think its the fuel pump. Plan was to finish it this comming week that will be put off till I get the car running.

so Current Status

Box is 80% finished still working out the porting.
Still need to buy materials to raise the back deck and build the AMP rack.

Also going to get the box coated with bed liner to protect it from the water that will get to the wheel well. Ill see if I can get him to send some picts of the current status.
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
Here are some Picts from today
 

Attachments

  • IMG_1233.JPG
    IMG_1233.JPG
    60.4 KB · Views: 18
  • IMG_1234.JPG
    IMG_1234.JPG
    54 KB · Views: 12
  • IMG_1235.JPG
    IMG_1235.JPG
    44.2 KB · Views: 8
  • IMG_1236.JPG
    IMG_1236.JPG
    69.3 KB · Views: 31

loki2043

New Member
Jan 23, 2006
645
0
0
Portland, OR
looking forward to it! ill pay you to help me make one of those for my rig!! im moving to tigard at the end of the month anyway. but my build isnt quite done yet:p
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
Ohhhh So close :) allmost time to test the box :)
 

Attachments

  • IMG_1239.JPG
    IMG_1239.JPG
    77.8 KB · Views: 23
  • IMG_1240.JPG
    IMG_1240.JPG
    68.3 KB · Views: 16
  • IMG_1241.JPG
    IMG_1241.JPG
    70.3 KB · Views: 12
  • IMG_1242.JPG
    IMG_1242.JPG
    67.3 KB · Views: 9
  • IMG_1244.JPG
    IMG_1244.JPG
    62.2 KB · Views: 10

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
next
 

Attachments

  • IMG_1249.JPG
    IMG_1249.JPG
    55.8 KB · Views: 8
  • IMG_1250.JPG
    IMG_1250.JPG
    70.6 KB · Views: 28
  • IMG_1253.JPG
    IMG_1253.JPG
    59.5 KB · Views: 15
  • IMG_1254.JPG
    IMG_1254.JPG
    67 KB · Views: 25

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
speed dodici said:
nice cuts, i need a router :(.

Did you do the math for that port?

27 ways to Sunday yes in Deed :) Started with a 3" port then said BAh lets go 4" then burned out 12 sets of batterys figureing out the port length, Volume ETC.
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
Yea Im not the enclosure builder :) A good friend who was an installer for about 15 years. (did alot of extreem custom work) and he is So ANAL about everything. Hopefully will be hooking it up to a Freq generator tomorrow for tuning.
 

Cravin Boost

MMMM Smells like coolant
Nov 8, 2005
170
0
0
Eugene OR
The Terminal block Inset
 

Attachments

  • connectorbox1.JPG
    connectorbox1.JPG
    65.5 KB · Views: 22
  • connectorbox2.JPG
    connectorbox2.JPG
    90.6 KB · Views: 17
  • connectorbox3.JPG
    connectorbox3.JPG
    46.5 KB · Views: 11